Integration and Maintenance of the Soil and Groundwater Pollution Remediation Information in 2009

Absrtact
In order to establish completed soil and groundwater data base and assist occupational execution of environmental protected institutions, the EPA had conducted " Soil and groundwater data combination and management project for year 2008 and 2009" (below called this project) which main job duties included: keep on expanding soil and groundwater pollution renovation related combination, promote the electric management of soil and groundwater pollution related and its cross communication function, continue on establishing related data websites to advance opening information to the public, maintain the usability of system, make sure the security of data and other duties. For the purpose of combination of soil and groundwater related data, this project conducted 7 system combination operation and provided 3 methods of system combination for side system usage, also completed system on-line on May 28th 2010 to let all system functions may be processed and managed from this system. Moreover this project had accomplished system log-on format and documents set up to be basic example for the EPA future related business scheme and process. In the same time, this project had completed connection with EMS system to link to system basic related business data. This project simultaneously superintended the sut up of log-on operation for soil and groundwater related data and established standard operation procedures of constructing files for soil and groundwater related data, cooperated with executive departments to develop 5 major management functions for saving operational time, also completed entire geographic information set up operation scheme for reference resources of EPA future development. During the execution of this project, the soil and groundwater pollution renovation website has been maintained under obeying related regulations, promoting area has been well eseablished and the contents of website have been updated regularly. Also all data security practices, system maintaining management, internet security management and related operations have been cunducted under EPA related regulations. And to cooperate with equipments relocation project, system main server has been completely relocated on November 19th 2009. Meanwhile, this project conducted library collecting operation weekly and cooperated with necessary business operation to accomplish 242 pages figures drawing service, and established specific questions service window, conducted 7 serial system usage seminars to assist local users to operate and apply.
Keyword
Soil, Groundwater, Soil and Groundwater Information Management System, Soil and Groundwater Pollution Remediation Web, Data Archive and Retrieve, System Control Room Relocation
Open
top